Lotus Emeya 900 electric vehicle exterior

Lotus Emeya 900 - Electric Vehicle Specs

Sedan AWD

Power

675 kW

(918 HP)

0-100 km/h

2.8 s

Top Speed

256 km/h

Battery Options

Standard Battery (102 kWh / 98 kWh)

Charging Curve & Charging Speed Analysis

Understanding Charging Performance

Charging performance isn't just about peak power—it's about sustained power across the entire charging curve. A vehicle that maintains 150kW from 10-80% SOC will charge faster than one that peaks at 250kW but quickly drops to 100kW after 20% SOC. The shape of the curve matters more than the highest peak power.

The key metric is C-rate, which accounts for both charging power and battery capacity. A C-rate of 2.0 means the battery can theoretically charge from 0-100% in 30 minutes, while 1.0 C-rate equals 60 minutes. This makes it easy to compare vehicles regardless of battery size.

Charging Curve Shape

Flat, sustained power across a wide SOC range beats high peaks that quickly taper off. Look for vehicles that maintain high power from 10-80% SOC.

C‑Rate & Timing

C-rate normalizes charging speed across different battery sizes. Higher C-rates mean shorter charging times and more flexible road trip planning.

Battery Options

Gross Capacity: 102 kWh
Net Capacity: 98 kWh
Buffer: 3%
The Lotus Emeya 900 reaches peak charging power of 401 kW between 10–80% SOC.
It takes 13 min to charge from 10–80% SOC and adds 338 km of real-world highway driving range, representing a 3.2 C‑Rate. This performance is better than 94% in its class.

Average Charging Power

156 kW

Avg C‑rate: 1.6

Maximum Charging Power

401 kW

At 7 → 28% SOC

Minimum Charging Power

22 kW

0–100% Charging Time

40 min

Charging Curve

State of Charge over Time

SOC Range Charging Time Avg. Power Avg. C-Rate Energy Added
0% → 100% 40 min 155.8 kW 1.57 C 106.3 kWh
0% → 90% 24 min 237.6 kW 2.40 C 95.7 kWh
0% → 80% 16 min 316.1 kW 3.20 C 85.1 kWh
5% → 100% 39 min 153.2 kW 1.55 C 101.1 kWh
5% → 90% 22 min 238.2 kW 2.41 C 90.4 kWh
5% → 80% 14 min 324.3 kW 3.28 C 79.8 kWh
10% → 100% 38 min 148.2 kW 1.50 C 95.7 kWh
10% → 90% 21 min 232.6 kW 2.35 C 85.1 kWh
10% → 80% 13 min 320.6 kW 3.24 C 74.5 kWh