Deepal S05 RWD electric vehicle exterior

Deepal S05 RWD - Electric Vehicle Specs

SUV RWD

Power

200 kW

(272 HP)

0-100 km/h

7.5 s

Top Speed

180 km/h

Battery Options

Standard Battery (68 kWh / 67 kWh)

Charging Curve & Charging Speed Analysis

Understanding Charging Performance

Charging performance isn't just about peak power—it's about sustained power across the entire charging curve. A vehicle that maintains 150kW from 10-80% SOC will charge faster than one that peaks at 250kW but quickly drops to 100kW after 20% SOC. The shape of the curve matters more than the highest peak power.

The key metric is C-rate, which accounts for both charging power and battery capacity. A C-rate of 2.0 means the battery can theoretically charge from 0-100% in 30 minutes, while 1.0 C-rate equals 60 minutes. This makes it easy to compare vehicles regardless of battery size.

Charging Curve Shape

Flat, sustained power across a wide SOC range beats high peaks that quickly taper off. Look for vehicles that maintain high power from 10-80% SOC.

C‑Rate & Timing

C-rate normalizes charging speed across different battery sizes. Higher C-rates mean shorter charging times and more flexible road trip planning.

Battery Options

Gross Capacity: 68 kWh
Net Capacity: 67 kWh
Buffer: 2%
The Deepal S05 RWD reaches peak charging power of 195 kW between 10–80% SOC.
It takes 27 min to charge from 10–80% SOC and adds 229 km of real-world highway driving range, representing a 1.7 C‑Rate. This performance is better than 64% in its class.

Average Charging Power

31 kW

Avg C‑rate: 0.5

Maximum Charging Power

200 kW

At 6 → 10% SOC

Minimum Charging Power

1 kW

0–100% Charging Time

2 h 19 min

Charging Curve

State of Charge over Time

SOC Range Charging Time Avg. Power Avg. C-Rate Energy Added
0% → 100% 2 h 19 min 31.0 kW 0.46 C 71.9 kWh
0% → 90% 43 min 89.9 kW 1.34 C 64.8 kWh
0% → 80% 30 min 113.4 kW 1.69 C 57.6 kWh
5% → 100% 2 h 16 min 29.9 kW 0.45 C 68.3 kWh
5% → 90% 41 min 89.3 kW 1.33 C 61.2 kWh
5% → 80% 28 min 114.4 kW 1.71 C 54.0 kWh
10% → 100% 2 h 15 min 28.6 kW 0.43 C 64.7 kWh
10% → 90% 40 min 86.4 kW 1.29 C 57.6 kWh
10% → 80% 27 min 111.1 kW 1.66 C 50.4 kWh